Machine en acier de Framig de quille en acier de mesure de lumière à grande vitesse de bâtiment préfabriqué
Informations de base.
Numéro de modèle. | XHH-C160 |
Personnalisé | Personnalisé |
Condition | Nouveau |
Type de contrôle | Système de contrôle informatique IPC |
Niveau automatique | Automatique |
Puissance du moteur hydraulique | 11 kW |
Tension | 380 V/50 Hz/3 pH |
Puissance du moteur | 15kw |
Largeur efficace | 160mm |
Changement de moule | Changement automatique |
Épaisseur de la bande de matériau | 0,8-2 mm |
Matériel pour perforateur | SKD-11 |
Matériau de l'arbre | SKD-11 |
Matériel pour le coupeur | SKD-11 |
Système de contrôle | Système de contrôle informatique IPC |
Service après-vente fourni | Ingénieurs disponibles pour entretenir les machines à l’étranger |
Forfait Transport | Joint |
spécification | 5400*1300*1600mm |
Marque déposée | XHH |
Origine | Fujian, Chine (Mianland) |
Code SH | 84552290 |
Capacité de production |
Q1.Are you a trading company or manufacture.1A: We are a factory.Q2. Do you provide samples ? Is it free or extra ?2A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.We could offer the sample for free charge3Q: Where is your factory located?3A: Our factory is located in Xiamen City, Fujian Province, China. You are warmly welcome to visit us !4Q: Can you make the machine according to my design or prototype?4A: Yes. We have an professional designer for working out the most suitable design and production plan for the machine that you are going to book with us5Q: How can I trust you that machines pasted testing running before shipping?5A: 1) We record the testing video for your reference. 2) You are welcome to visit us and test machine in our factory. 6Q: Do you provide installing and training overseas?6A: Overseas machine install and worker training services are optional.7Q: How is your after sales support?7A: We provide technical support on line as well as overseas services by skillful technicians.8Q: Guarantee period:8A: Within one year since the date of finishing commissioning.